LAST PLANNER® SYSTEM WORKSHOP I

TUESDAY MARCH 23, 2021 | 7:30AM - NOON

LOCATION: ABA OFFICE
2552 W. ERIE DR., SUITE 106,  TEMPE, AZ

Register here


This course will count as 4 hours towards your CM-Lean Continuing Education Credits, should you need it.

WELCOME TO LAST PLANNER® SYSTEM WORKSHOP I

To achieve maximum production on our construction sites, the Last Planner® System plays a vital role in supporting the team effort in working toward planned accomplishments. Implementing LPS enables our project teams by increasing reliable predictability, understanding the network of commitments and demonstrating accountability as we move along a planned path. As well as aiding us in determining course corrections when obstacles (variation) are encountered.

LPS Workshop 1 is designed to build upon those skills introduced in Unit 4 of the ‘CM Lean’ certification curriculum developed by the AGC. As well as provide Continuing Education credit toward maintaining your CM Lean Certification.

Additionally, whether or not you are CM Lean certified this course may prove beneficial to you & your project teams if you are looking to achieve the following:

  • Begin utilizing the Last Planner® System on your projects.
  • Identify the 8 types of waste that ‘subtract value’ on your project
  • Learn how to lead a Pull Planning event with your project teams
  • Increase team member participation, developing Lean Champions
  • Maximize use of ‘Constraint Logs’ & ‘Parking Lots’.
  • Increase Work Structuring & ‘make-ready’ conversation skills
  • Identify and work through ‘variation’
  • Demonstrate progress through Percent Plan Complete (PPC)

AGC of America recognizes Last Planner® System Workshop I as qualifying for continuing education hours towards the renewal of AGC’s Certificate of Management-Lean Construction (CM-Lean). Each hour of educational content is equal to 1 hour of CE credit. Attendees may earn up to 4.0 hours of CE credit by attending the entire Workshop.

INSTRUCTOR

STEPHEN NICHOLS, LEED AP, CM-LEAN
Project Director
A3 Construction Mgmt. Services, LLC.

Book both Lean Last Planner® Workshops now, and
receive a discounted rate!

March 23, 2021 | Last Planner® System Workshop I
May 4, 2021 | Last Planner® System Workshop II

OUR COVID-19 GUIDELINES

  • Self-monitor for signs of illness, fever, headaches, body aches or shortness of breath prior to coming to this event and throughout the day. Please do not attend if you are not feeling well.
  • Prior to entering the event a temperature scan shall be performed. If an individual is experiencing any of the symptoms above, he/she will not be admitted.
  • Face coverings are required to be worn at all times, unless you are eating or drinking.
  • Social distancing is required of 6’ between persons.
  • Follow proper hygiene practices by washing hands frequently.
  • Do not share food or drink items.